Prefab Home Buyer's Kit

Your first prefab order, from the first call to delivery day

Three guides for private buyers: what to understand before you talk to anyone, what to ask every manufacturer, and what to check at each stage after you sign.

Buy the Kit · €24.90

3 PDFs in English, about 90 minutes of reading. Payment by Stripe. You can download the files straight after payment.

Guide cover: How to order a prefab home without regret
How to Order a Prefab Home Without Regret
Guide cover: Prefab homes demystified
Prefab Homes Demystified
Guide cover: 10 questions to ask your prefab home manufacturer
10 Questions to Ask Your Manufacturer

What's in the Kit

For people considering a prefab or modular home for the first time, comparing quotes, or hearing different things from different manufacturers. Not for people who have already signed a contract, or for industry professionals looking for technical production content.

How to Order a Prefab Home Without Regret about 45 min

The process for a first order, in nine parts:

  • the main prefab systems (volumetric, panel, CLT, hybrid) and why you need to know which one you're being quoted
  • what to prepare before the first call, so quotes are comparable
  • building a longlist and the three questions for first contact
  • the factory visit: what to look at and who to meet
  • what “turnkey” usually leaves out, item by item
  • what the contract must contain, and the red flags
  • staying involved during production
  • delivery day and the snagging period
  • seven patterns that turn a good project into a stressful one

Plus three checklists: before you sign, during production, at delivery.

Prefab Homes Demystified about 30 min

Ten common beliefs about prefab, from both sceptics and marketing. For each: where it comes from, what's true, the caveat, and the one question to ask a manufacturer. Covers cost, “turnkey”, lifespan, customisation, mortgages and permits, expansion and warranty.

10 Questions to Ask Your Prefab Home Manufacturer about 20 min

If you signed up for it, you already have it. It's in the Kit so all three guides are in one place.

How to use it

Before you contact anyone
Read Demystified and parts 1–2 of How to Order. You'll know which system you want and have a brief a factory can quote against.
While comparing manufacturers
Use the 10 Questions with each one, and part 4 of How to Order when you visit the factory.
Before you sign
Go through the contract section and the “Before you sign” checklist.
After you sign
Use the production and delivery checklists. Don't sign the acceptance document until you've inspected everything.

Free guide or the full Kit

Free 10 QuestionsBuyer's Kit
Questions for manufacturersYesYes
Prefab systems and writing a briefNoYes
Factory visit protocolNoYes
What turnkey leaves outBrieflyIn detail
What the contract must containNoYes
Production, delivery, snaggingNoYes
Ten prefab mythsNoYes
Checklists1 card3 checklists + card
Gennadii Bakunin, founder of Prefab Lab

Who wrote it

Gennadii Bakunin, about 15 years in prefab: factories, sites and negotiations across Europe. Founder of Prefab Lab, which works with architects, manufacturers and developers on prefab projects.

The guides name no manufacturers and contain no affiliate links.

Price and details

€24.90 incl. VAT

3 PDFs in English. After payment you land on a page with download links, and your Stripe receipt links back to it.

Payment runs on Stripe: you pay on Stripe's page and then return to our site. We never see your card details.

Because the files are delivered straight away, by buying you agree to immediate delivery and give up the 14-day withdrawal period for digital content. See our Terms of sale.

Questions: bakunin@prefablab.io

Buy the Kit · €24.90

Questions

I already have the 10 Questions. Am I paying for it twice?

The Kit includes it so all three guides are in one place, but what you pay for is the two longer guides.

Does it apply in my country?

It's written from European practice with prices in euros. Contracts, payments, warranties and delivery work in similar ways elsewhere. Permits, mortgages and law are local, and Demystified has a section on where these are routine and where they need more work.

I've already signed a contract. Will it help?

Mostly not. The Kit is built for the stage before signing. The production and delivery checklists may still be useful, but we'd rather you didn't buy it for those alone.

How do I get the files?

Right after payment you land on a page with download links for all three PDFs. Stripe emails you a receipt with a link back to that page.

Is payment secure?

Payment runs on Stripe. We never see or store your card details.