Cookies
We use cookies for analytics (Google Analytics) and to measure our ads (Meta Pixel). They stay off unless you accept. Privacy policy
Cookies
Cookie settings
Essential cookies are always on. You choose the rest.
Essential
Always on. They keep the site working and protect it from attacks.
Analytics
Disabled
Google Analytics. Shows us which pages people read and where they come from.
Advertising
Disabled
Meta Pixel. Shows whether our ads on Facebook and Instagram lead to visits and requests.

Prefab and modular construction consulting

We find the expensive mistake in your prefab project before the factory or the market does

Prefab Lab is a prefab and modular construction consultancy in Belgrade and Riga. Our architects, engineers and marketers have designed, produced and sold prefab themselves, and we work from the first drawing to the factory floor.

Axonometry of a CLT house structure from a Prefab Lab working drawing
Axonometry of the CLT structure by Prefab Lab

Worked with

  • Fabrika Rauna
  • Muj Barn
  • Karhard
  • Brette Haus
  • Wigo
  • Tiny Villa
  • Compact Housing
  • NEFA Architects
  • BAU Fabrika
  • Raus

02

Who we work with

Architects, manufacturers and developers who carry the risk of a prefab project

Architects

Your concept stands out, and factories can't price it.

Quotes come back vague, inflated or wrong. The factory can't read the drawings as a buildable product, doesn't want to, or doesn't believe the order will scale.

Manufacturers

Your line can do more than your sales show.

The bottleneck sits in how the offer is defined, explained and sold. Or you build to other people's drawings and want a product line of your own.

Developers and founders

Every project turns out to be a one-off.

You want a repeatable product and a multi-unit project that pays off, where today's decisions don't become tomorrow's constraints.

Whichever is closer to you, the first step is the same: 45 minutes, free.

Book a free Feasibility Session

03

Where projects break

Most prefab mistakes are cheap when they start and expensive when they are found

The offer is vague.

Nobody can say in one sentence who the product is for, what it replaces or why it costs what it costs. Marketing on top of that brings the wrong leads faster.

Strategy & Marketing

The drawings are not factory-ready.

The renders sell the idea, but the details still leave the factory guessing. Whatever the factory has to reinterpret, it solves its own way, and you pay the difference on every unit.

Design, Engineering & Prototyping

Decisions get pushed to later.

“We’ll solve it later” is where the budget goes. One open decision at the drawing stage becomes ten on the factory floor.

Design, Engineering & Prototyping

Everyone means something different by “prefab”.

The architect means design freedom, the factory means standardisation, the investor means margin. We align them before the contract.

Knowledge

04

Who is behind Prefab Lab

We have designed, produced and sold prefab ourselves

Gennadii Bakunin working on a laptop on the factory floor
Gennadii Bakunin, architect and founder. 15 years of practice in modular architecture and manufacturing. Offices: Belgrade · Riga
  • We came out of a prefab company.

    In 2021 architects and designers kept bringing Brette Haus projects that factories had rejected because of unclear drawings or production problems. Prefab Lab started there and became an independent company in 2023. What didn’t sell at Brette Haus got noticed fast, and we still test every strategy against that.

  • We work on the factory floor.

    Through Prototype Factory with Fabrika Rauna, a 4,000 m² facility in Latvia, we build and test first full-scale units in factory conditions.

  • We know which factory fits.

    We match projects with manufacturers across the Baltics and Balkans and brief them, so your drawings go to factories that can build them.

  • One team for the product and the market.

    Architects, engineers and marketers work on the same project, so the product and the way it is sold stay aligned.

2021

Brette Haus starts reworking rejected designs for production

2023

Prefab Lab becomes an independent company, working on prefab and modular projects from concept to production

2026

Projects with studios and manufacturers in Europe, the US and North Africa

06

Proof

Real projects, measurable progress

Czechia · Manufacturer

18-month order backlog

From plywood garden cabins to CLT homes

Plywood became scarce and expensive, so we moved a garden-cabin manufacturer from a plywood-and-beam system to CLT. We designed its first CLT holiday homes and houses, and the switch took six months. The new order book filled production for the next 18 months, and we stayed with the team through the first year of delivery.

Serbia · factory

€1M project in month 13

From a new brand to a project worth nearly €1 million

We created the brand for a company building CLT and glulam houses, advised on unit economics and finance, and helped it exhibit at SEEBBE and Modul Expo in the Balkans. In its 13th month the company is already working on a project worth nearly €1 million.

Morocco · Startup

6 homes in 14 months

Morocco’s first modular housing startup

Over 15 consulting sessions we helped a team launch the first modular housing startup in Morocco. Fourteen months after we started, its first six homes were sold and installed.

United Kingdom· Brand

60 units in 2 years

From a rejected concept to serial production

Major manufacturers had turned the design down. We made it production-ready, built a prototype and reached the first 60 units within two years. The company went on to raise $6 million.

07

Sessions

Start where the risk is highest

Every project starts with a conversation. If it needs more, we tell you which audit and why.

  1. 1 · Free session: we find out where the risk sits
  2. 2 · Audit: 90 minutes on the problem that matters most
  3. 3 · Project: we agree scope and price in writing

45 min · Free

Free Feasibility Session

Not sure which side the problem is on? Start here.
You leave knowing whether the project is closer to ready than you think or further away, and what to do first.

Book a free session

90 min · €290

Strategy & Marketing Audit

We pressure-test your product definition, positioning and go-to-market logic before you spend on promotion.

You leave with: answers to the questions you sent before the call, a written summary of the call and the contacts you need for the next step.

Book the audit

90 min · €240

Design & Drawings Audit

We review your design and documentation against what a factory needs to build it.

You leave with: answers to the questions you sent before the call, a written summary of the call and the contacts you need for the next step.

Book the audit

Online, in English. Audits are paid when you book, prices include VAT. Free cancellation up to 12 hours before the meeting. If something unforeseen comes up, we move the meeting at no cost.

08

Knowledge

Free guide · PDF

New to prefab? Start with 10 Questions to Ask Your Prefab Home Manufacturer

Get the free guide

09

Request

Tell us what you are building before it gets harder to fix

Describe the project in a few lines. We reply within one working day and suggest where to start.

Prefer to talk? Book a free Feasibility Session